Wayne Memorial Pedestrian Bridge Repairs
The underside of the bridge was inspected to determine the extent of the section loss and it impact on the bridge. Once this was determined an analysis was performed using to reduced sections.
Client:
Wayne Memorial Hospital
Architect:
–
Project Cost:
$250,000
Project Size:
–
Contact:
Mr. John Conte | 570-253-8169
Completion Date:
2016
Engineering and Surveying
E.D. Pons and Associates provided the structural engineering services for the additions and renovations to Wayne Memorial Hospital in Honesdale, PA. When complete, the new building will contain 50 private patient rooms, future shell space, and a new main entry. The project also includes a linking bridge that spans over the existing two-story portion of the hospital to connect the existing four-story patient tower. The link connects at two levels. To meet the hospital requirements the bridge is designed to clear span over the low building without any intermediate supports.
The new construction is a five-story steel-framed structure. The floors are constructed of composite steel deck supported by steel beams. Lateral support is provided by moment and braced frames. All of the existing and new construction was modeled using Revit Structure. This model was used to prepare the construction documents and improve the coordination between the design team.
Working with us
Our firm is within easy driving distance of both the New York and Philadelphia metropolitan areas, allowing us to offer our experience, proficiency and ingenuity to a broad range of clientele. Our average yearly projects fall within the range of 40% institutional, 35% commercial and 25% special structure and residential clients.
Sixty percent of our staff are registered professional engineers. We guarantee the direct personal involvement of the principal in all phases of projects, including site visits and consultations.