GCMC C & E Wing Additions and Renovations
The new construction is a steel-framed structure designed to support a total of seven stories
Client:
Geisinger System Services
Architect:
Burkavage Design Associates
Project Cost:
$95,000,000
Project Size:
125,000 sq. ft.
Engineering and Surveying
E.D. Pons Associates, P.C. provided the structural engineering services for the additions and renovations to the “C” and “E” wing at Geisinger Community Medical Center in Scranton, PA. When complete, the new building will contain 14 new operating rooms, a new intensive care unit, new pre-op and PACU, and shell space. The project also includes a pedestrian bridge to access an existing parking garage and extensive renovations to the existing building.
The new construction is a steel-framed structure designed to support a total of seven stories. During the current phase only the first five stories will be constructed. Portions of the new “E” wing will be constructed over the existing emergency room which will remain operable during construction. All of the
existing and new construction was modeled using Revit Structure. This model was used to prepare the construction documents and improve the coordination between the design team.