GCMC C & E Wing Additions and Renovations


The new construction is a steel-framed structure designed to support a total of seven stories

GCMC C & E Wing Additions and Renovations


The new construction is a steel-framed structure designed to support a total of seven stories

Client:

Geisinger System Services

Architect:

Burkavage Design Associates

Project Cost:

$95,000,000

Project Size:

125,000 sq. ft.

GCMC C & E Wing Additions and Renovations | E D Pons Associates, PC Structural Engineers
GCMC C & E Wing Additions and Renovations

Engineering and Surveying

E.D. Pons Associates, P.C. provided the structural engineering services for the additions and renovations to the “C” and “E” wing at Geisinger Community Medical Center in Scranton, PA. When complete, the new building will contain 14 new operating rooms, a new intensive care unit, new pre-op and PACU, and shell space. The project also includes a pedestrian bridge to access an existing parking garage and extensive renovations to the existing building.

The new construction is a steel-framed structure designed to support a total of seven stories. During the current phase only the first five stories will be constructed. Portions of the new “E” wing will be constructed over the existing emergency room which will remain operable during construction. All of the
existing and new construction was modeled using Revit Structure. This model was used to prepare the construction documents and improve the coordination between the design team.